Rubbled filled construction site with bull dozer. South buildings still visible on left side of photograph. Back view of building from RG 536.15.14.05.
Excavation of North end of property in preparation for Howard Kerr Hall construction. View looking East towards already constructed section of Howard Kerr Hall.
Excavation of west side of property looking North towards Gerrard Street. Gorrie's Motors and Maple Leaf Gardens visible in the background. Excavation for the construction of Howard Kerr Hall.
Excavation in front of Ryerson Hall (Normal School). View looking east towards Church St. Already constructed section of Howard Kerr Hall is visible in the background.
Construction of the foundation for Unit II in the North East corner of the lot (Gerrard and Church Sts.) Unit I visible in the background as is the remaining Normal School building.
Ryerson Hall building along Gould St. Egerton Ryerson statue has already been removed for storage and there is hoarding along the front of the building.
South West corner of Ryerson Hall and heating plant building. Iron framework for Unit II of Howard Kerr Hall visible on left side of photo and beginning of foundation along Gould Street visible.
Middle building with construction materials lying against its walls. Metal framework for Howard Kerr Hall along Victoria Street visible on the right side of the photo.
Looking from the corner of Gould and Victoria Sts at the campus and construction. Visible is the metal framework along Victoria St. for Howard Kerr Hall, the heating plant building and the West side of Ryerson Hall.
West end of Ryerson Hall building. Photograph taken from Bond Street looking towards the structure. Metal framework for Howard Kerr Hall visible on the left side of the photograph.
East end of Ryerson Hall building. Perini construction sign on the fence in front of the building. Photo taken from Bond Street looking at the front of the structure. Howard Kerr Hall Unit I visible on the right side of the photo.
Looking towards Victoria Street. Underwood building sits on the corner. Photo shows construction cranes and metal framework for Howard Kerr Hall. Ryerson Hall visible on the right side.
Workers digging done on foundation of Howard Kerr Hall Unit I in preparation for pouring of foundation of Unit III - section along Gould Street. Ryerson Hall Building visible in the background.
Photograph taken looking east along Gould Street at Unit III of Howard Kerr Hall. Only the metal framework of the section is completed with some marble work along the base.
Photograph taken looking east along Gould Street at Unit III of Howard Kerr Hall. Only the metal framework of the section is completed with some marble work along the base. Unit I is visible in the background which is eventually joined with Unit III by a portico.
Three construction workers. Two are working on steel beams. The third is filling a wheelbarrow. Other workers, a crane, and Ryerson Hall can be seen in the background.
Metal framework for Howard Kerr Hall along Victoria and Gould Sts. Photograph taken from across Gould St. also shows Ryerson Hall and the bricked section of Kerr Hall that runs along Gould from Church St.
Photograph taken from inside quadrangle looking east at the brick work being done on Howard Kerr Hall. Remaining Ryerson Hall building visible on the left side of the photo.
Conveyor belt moves bins from outside up into the second story of Howard Kerr Hall. One construction worker is loading the materials and another is removing it as the top.
Photograph taken from inside quadrangle looking east at the brick work being done on Howard Kerr Hall. Remaining Ryerson Hall building visible on the left side of the photo.
Seven photographs of the construction of the Kerr Hall. Majority of photographs of the Gould St. section of Kerr Hall featuring the clock/carillion tower.
Metal framework of centre section of Howard Kerr Hall South - which would eventually house the Principal's office and the Boardroom. Framework for clock-carillon tower is up as well. Framework obscured in photo by the Ryerson Hall building.
Portico out onto Gerrard Street that is the entrance to the Ryerson Theatre. Photo taken from inside the quad looking North West. Construction materials are piled against the wall of the building and construction vehicles are scattered about.
Metal framework of centre section of Howard Kerr Hall South. Framework for clock-carillion tower is up as well. Photograph taken looking north east on Gould Street. Part of Unit I is visible in the far right corner.
Metal framework of centre section of Howard Kerr Hall South. Construction workers and material visible around the base of structure. Part of Unit I is visible in the far right corner. Photo taken looking north east along Gould Street.
Metal framework of centre section of Howard Kerr Hall South. Framework for clock-carillion tower is up as well. Photo taken looking north from Gould Street.